prefabricated apartment/steel villa to Australia
| Place of Origin: Guangdong China (Mainland) | Material: Q235 | Surface finish: hot dip galvanized | Steel sections: H beam,I beam,angle, square tube,channel etc |
Advantage:
1, Protect forest resources
2, Protect environmental, do not produce harmful material
3, Prevent fire and insect.
4, Good shock resistance ability
5, High quake-proof, water proof and fire proof
6, Short construction time
7, Fast construction, save time and labor cost
8, Prefabricated and customized design
9, High space efficiency
10, Life time: Over 25-50years
11, Good safety performance.
12, Nice appearance
Our service:
-Quotation according to yours drawing
-Design and quotation according to yours requirements
-Delivery the entire steel building to you by containers;
-Offer all the detailed drawings for installation and fabrication.
We are manufacturer of various steel structure building, like warehouse, workshop, houses etc.
| Main Structure | Welding H Steek |
| Purlin | C section Channerl or Z section channel |
| Roof Clading | Sandwich Panel or Corrugated Steel Sheet wirh Fiber Glass Wool Coil |
| Wall Clading | Sandwich Panel |
| Tie Rod | Circular Steel Tube |
| Brace | Round Bar |
| Column Bracing and Transverse Brace | Angel Steel or H Section Steel or Steel Pipe |
| Knee Brace | Angel Steel |
| Roof Ridge | Corrugated Steel Sheet |
| Wrapping Cover | Color Steel Sheet |
| Roof Gutter | Color Steel Sheet |
| Rainspout | PVC pipe |
| Doors | Sliding Sandwich Panel Door or Metal Door |
| Windows | PVC or Aluminum Windows |
| Connection | High Strength Bolts |
The information we need you offer if you want our design:
| Name | Steel Structure Building |
| Size | L*W*H/ Ridge Hight/Slope |
| Usage | What will the building be used in |
| Country | Which country the building will be |
| Design Load | Wind Speed/Snow Load/Earthquake |
| Wall and Roof | Panel or Steel Sheet |
| Insulation | Sandwich Panel/Fiber Glass/Rock Wool/PU |
| Surface | Hot DIP Galvanize or Painted |
| Window | Quantity/Material/Dimension(W*H) and Position |
| Door | Quantity/Material/Dimension(W*H) and Position |
| Accessories | Down Pipe/Gutter/Ventilator/Skylight ect/ |
And the following photo is making pallet status before loading.
| Packaging Detail:In bulk or put all the components on steel pallet. |
| Delivery Detail:Within 30-45days after confirm drawing and receipt 30% deposit |

