Strand woven bamboo floor transition strips-T molding ISO flooring accessories - ISO flooring accessories
floor transition strips ISO flooring accessories, Low carbon,make your life more comfortable, Water-proof,anti-scratch - details see: https://www.buildingsupplieshub.com/strand-woven-bamboo-floor-transition-strips-t-molding-iso-flooring-accessories-10071274
| Type: Flooring Accessories | Place of Origin: Hubei China (Mainland) | Brand Name: Juning | Model Number: ISO flooring accessories |
| Flooring Accessories Type: T molding | Raw material: 100% bamboo fiber | Source of raw material: Local(Xianning) | Glue: Dynea |
| Usage: necessary accessaries for indoor flooring installation | floor transition strips: floor transition strips |
floor transition strips
Details Description
| 1 | Item | Strand woven bamboofloor transition strips-T moulding | ||||
| 2 | Model No. | JN-N005 | ||||
| 3 | Grade | A | ||||
| 4 | Material | 100% Moso bamboo fiber | ||||
| 5 | Size | 1850*50*18mm, or according to the size of bamboo floor | ||||
| 6 | Color | Carbonized, dark brown, natural | ||||
| 7 | Moisture Content | 8%-10% | ||||
| 8 | Hardness | ASTM D 1037 | ||||
| 9 | Density | ≥1.15kg/m3 | ||||
| 10 | Formaldehyde Emission | Europe E1 Standard | ||||
| 11 | Function | T molding | ||||
| 12 | Coating | Multi-layer UV coating, Treffert/Klumpp laquer | ||||
| 13 | Certification | ISO9001, CE | ||||
| 14 | Installation | Glue, nail down | ||||
| 15 | Warranty | 25 years of strutural guarantee | ||||
Features
1. Tough durable, abrasion resistance, sound-proof, Insect-free, not afraid of water, moisture proof;
2. High density and hardness, pressure resistance, Eco-friendly, renewable.
3. Used to transition from bamboo to other floor coverings, for example ceramic tile.
4. Moisture control coating on sides and back of floor
5. Directly glue-down installation to concrete floors approved
6. Lowest price with 100% Grade A Moso bamboo
| Packaging Detail:Packing: cartons, 18pcs/ctn, or according to client's requires. |
| Delivery Detail:3 weeks after contact confirmed |

