steel structure frame roof building - JY-SS256

1.Light weight, 2.Environmental friendly, 3.Labor and time saving, 4.Easy construction,simple installation, 5.long using life - details see: https://www.buildingsupplieshub.com/steel-structure-frame-roof-building-10040215
Place of Origin: Zhejiang China (Mainland)Brand Name: JinYiModel Number: JY-SS256Grade: Q235, Q345
Main structure: H type column,Z type purlin,C type purlinWall system: EPS/Rock wool panel/corrugated color steelRoof: EPS sandwich panel/corrugated color steelFloor/foundation: PVC/concrate
Window: aluminum alloyDoor: steel door/rolling steel doorCrane: with or w/oInsulation: glass wool
Sloop: double or single   
steel structure frame roof building
contact supplier for steel structure frame roof building


Hangzhou Jinyi Steel Grid Structure Manufacturing Co., Ltd.

Main Grade: Q345B,Q235B

Standard:ISO9001:2000

Certificate:AWS Welder Passport From USA

We are a Factory-direct provider of all kinds of steel structure buildings and material plant. We specialize in design ,fabricate construction ,install and related tecnology guide.Our competitive price and high quality have got customers from all over the word.

Applications:

Steel workshop/warehouse/shed, Exhibishion Hall,Office buildings, Garage,Multy-story building,Hanger,Agricultral storage,Logistic centers,and all kinds of steel materials.,etc.

Specifications:

Main Steel: Q345B,Q235B

Column&Beam: Welded or Hot rolled H-section

Wall&Roof: EPS, Rockwall, PU sandwich ,corrugated steel sheet

Door: Rolled up door or Sliding door

Window: Plastic steel or Aluminum alloy window

Surface: Hot dip galvanized or painted.(all colours we can do)

Crane: 5T,10T,15T,ect.

Drawings&Quation:

1.Customized design to welcome.

2.As long as you like ,we can design and provide drawings for you.

3.In order to give you an exactly quotation and drawings, pls tell us the Length,width,eave height and local weather . we'll quote for you prompt.

Terms:

Payment: L/C or by T/T(30% prepaid as deposi,the balance 70% before shipment)

Delivery time: 15~40 days, usually as customers's order

Shipment: 20'GP,40'GP,40'HQ,40'OT or in bulk

metal Warehouse/Workshop building

Packaging Detail:flat packing,intergrated rack for main structure,easy to load and unload,safety
Delivery Detail:depends on the building area

Related Product for steel structure frame roof building