SS202 Z Anchor,Stone Fixing System - STAINLESS STEEL

SS201 SS202 SS304 SS316 Z Anchor/Cladding Fixing /Marble Bracket/Cladding Clamp/Marble Clamp/Strut Fitting/Marble Fixing - details see: https://www.buildingsupplieshub.com/ss202-z-anchor-stone-fixing-system-10044722
Type: Curtain WallsPlace of Origin: Jiangsu China (Mainland)Brand Name: JSZYModel Number: STAINLESS STEEL
Material: SteelCertification: ISO9001 SGSFinish: PolishPacking: In cartons and then on pallets
Inspection: MTCMOQ: 10000PCS  
SS202 Z Anchor,Stone Fixing System
contact supplier for SS202 Z Anchor,Stone Fixing System


SS201 SS202 SS304 SS316 Z Anchor/Cladding Fixing /Marble Bracket/Cladding Clamp/Marble Clamp/Strut Fitting/Marble Fixing/Stone Fixing/Beam Clamp

Direct fixing in to concrete walls with expansion bolts. Indirect fixing on to sub channel system with hex bolts

Suitable for concrete walls. Anchors are fixed directly on to concrete walls with expansion bolts.

1.Recommended projection size between 45 mm to 135 mm and loads up to 800N.

2.In horizontal joint installation slabs are pinned on the bottom and upper sides. Anchors act as load bearing carrying half the weight of the slabs above. Anchors also act as restraint holding the slabs below and restraining against wind suction and pressure.

3. In vertical joints installation slabs are pinned at the left and right sides. Anchors on the bottom are load-bearing anchors carrying the whole weight of the slab. Half the weight of the slab on the left and half the weight of the slab on the right. Anchors on the top are restraint anchors holding the slabs and restraining against wind suction and pressure.

4. Three - dimensional adjustability allows quick and easy installation.

TradeMark: JSZY
Certificate: ISO9001,SGS
Min Order: 10,000pcs
Packing: In cartons and then on pallet......
Delivery Term: FOB/C&F/CIF
Lead Time: Within 20days after the order is confirmed
Payment Term: 30% by T/T as Downpayment,the balance against the copy of B/L; L/C at sight



Price Terms: FOB SHANGHAI
Payment Terms: TT/LC
Packing: 200sets per carton
Lead Time: 25days after the order is confirmed
Standards Certificate: ISO9001:2000

....

Packaging Detail:In cartons and on pallets
Delivery Detail:Within 30days after the order is confirmed

Related Product for SS202 Z Anchor,Stone Fixing System