Prefabricated Warehouse - SS-3065

Prefabricated Warehouse, 1)Size:W9.15xL20.0xH4.5m(30'x65'x15'), 2)Fabric:PE or PVC, 3)Frame:galvanized, 4)Rolling up door - details see: https://www.buildingsupplieshub.com/prefabricated-warehouse-10040855
Place of Origin: Shandong China (Mainland)Brand Name: EAST COVERModel Number: SS-3065Fabric: 300/m2 PE, 650g/m2 PVC, 900g/m2 PVC
Featuring: Waterproof, UV resistantFire Resistant: CPAI-84 section 5 for PE and DIN4102 B1 for PVCColor: White, GreyFrame: Hot dip galvanized
Certificate: CE, SGS, ISO 9001Assembly Manual: IncludedAccesories: Anchors includedDoor Type: Pull ease rolling up door
Roof Style: RoundType: Garages, Canopies & CarportsFrame Material: MetalPressure Treated Wood Type: Nature
Metal Type: SteelFrame Finishing: Powder Coated or GalvanizedSail Material: PE or PVC FabricSail Finishing: PEor PVC Coated
Prefabricated Warehouse
contact supplier for Prefabricated Warehouse


Prefabricated Warehouse with Factory Price

Product Information:

Item No.306515
Dimension:W9.15xL20.0xH4.5m(30'x65'x15')
Frame:steel tube, hot dip galvanized
Fabric:durable PE or PVC, 100% waterproof, UV resistant, fire retardant
Meas.:Box A:272x73x58cm
Box B:292x75x53cm
G./N.W:980/ 860kg
1190/ 1070kg
Loadability:20/40ft: 12units/24units
Door typeexclusive Roll-Up door
AdvantageFirm structure and easy assembly, withstand heavy wind and snow.
Application:Ideal for storage of equipments,tools and large vehicles,etc.
Remark:Different length for your choice,12m, 26m, etc.

Material guarantee:

1. The Prefabricated Warehouse frame material: heavy duty hot dip galvanized steel tube, sturdy and never rust, last 10 to 15 years.

2. The Prefabricated Warehouse fabric material: durable fabric, 100% waterproof, UV resistant. 300g/m2 PE fabric, white or silver grey color, with fire resistant of CPAI-84 Section 5 standard; 650g/m2 or 900g/m2 PVC fabric, grey color, with fire resistant of DIN4102 B1 standard.

3. Accessories: steel bolts, hot-dip galvanized anchors, strong winches.

4. Package: painted strong steel box, keep all parts and accessories safe and sound.

Factory and workshop:

Why choose us:

1. High quality raw material

2. Factory directly

3. Convenient tansportation: close to the seaport (Qingdao Port)

4. Short delivery time

Packaging Detail:1. Cover wrapped up by durable fabric bag 2. Frame and hardware packed in strong seaworthy steel box
Delivery Detail:25 to 30 days

Related Product for Prefabricated Warehouse