Post Tensioning Prestressed Anchorage - M13(12.7mm) Anchor

Anchorage, 1.High quality and high performance, 2.Post tensioning work, 3.Competitive price, 4.CE&ISO - details see: https://www.buildingsupplieshub.com/post-tensioning-prestressed-anchorage-10086973
Place of Origin: Henan China (Mainland)Brand Name: GECModel Number: M13(12.7mm) AnchorMaterial: Steel
Type: AnchorageColor: GalvanizedCertificate: CE&ISOParts: anchor ring/plate, wedge, base plate, spiral bar, bellows
Application: Bridge, railway, highway, buildingWedge: Two types(2 pieces and 3 pieces)Wedge Hardness: HRC54-64 
Post Tensioning Prestressed Anchorage
contact supplier for Post Tensioning Prestressed Anchorage


Product Description
GYM series of Prestressed Anchorage

Anchorage for prestressing work. In post-tensioned concrete, anchorage anchors play a very important role. The effect of pre-stressing depends on the load that the anchors allow, and anchors’ capability decides the security of the post-tensioning.

GYM series of Prestressed Anchorage
1.Type: Single-hole, Multi-hole; Circular, Flat

2.Parts: Anchor Ring/Plate, Wedge, Base Plate etc

3. Have a high anchor efficiency and very good performance

4. Easy to use,safe and reliable

GYM series of Prestressed Anchorage

1. M15 applies to 15.2/15.24mm, 15.7mm pc strand.

2. M13 applies to 12.7mm, 12.5mm & 12.9mm pc strand.

3. M18 applies to 17.8mm pc strand.

4. M22 applies to 21.6/21.8mm pc strand.

5. M11 applies to 10.8mm pc strand.

6. M10 applies to 9.3mm, 9.53mm pc strand.

7. M7, M6, M5 apply to 7.0mm, 6.0mm, 5.0mm spiral ribbed pc wire

We can manufacture all kinds of anchorage and prestressed equipment according to your requrement and drawings .

Pre-stressing method is widely used in engineering structures in which anchorage plays a very important role.

The pre-stressed anchorage is the important part of a firm system of a pre-stressing anchor, and its capability influences the security of the pre-stress component directly.

Complete sets of Anchor System:
Wedge

Wedge is the key part of anchorage system, which is made by high-class alloy steel 20CrMnTi. Its form is divided into two-chip and three-chip. The system apply to the two-chip BJM15-J, it can be used for ring anchorage,flat anchorage, but also used for porous coupler.

Anchorage ring

Anchor ring is the key part of bearing the Prestressing tension. The ring anchorage is made by 45# high-quality carbonconstruction steel, and the flat anchorage is made by 40Cr steel. It includes the ring anchorage head and flat anchorage head.

Bearing plate

Bearing plate is the key component, which transfer the load from anchorage ring to concrete under anchor. The method of transfer and distribution of stress affect the anti-cracking and load capacity of concrete.

Bursting reinforcement

The bursting reinforcement used for distributing the concrete. For prevent concrete from crazing, and use the burstingreinforcement for strengthening tendons.

Metal Bellows(mental ducts). And we have metal bellows moulding machine and flat pipe machine.

Metal bellows used for the post-tensioning prestress concrete structure or constructive pore-forming. It can be divided into ring and flat by the section shape; divided into standard and enhanced by radial stiffness; divided into metal and plastic tubes by material, and the metal can be divided into galvanized and ungalvanized.

Wemanufacture different kinds of anchorage

Application:

It has been widely adopted by modern construction, especially used in pre-tension or post-tension for concrete constructions as building materials.

Packaging & Shipping

GYM series of Prestressed Anchorage

Packaging Detail: Standard export packaging: cartons with 350(L)*180(W)*140(H) and 5PCs/carton or according to your requirment.

Shipping Detail: in stock; out of stock (5 days); customized(7 days)

Company Information
GYM series of Prestressed Anchorage
Our anchorage workshop and storage
The overview of ouranchoragefactory

Our Certificate

Packaging Detail:Anchorage: Standard export packaging: cartons with 350(L)*180(W)*140(H) and 5PCs/carton or according to your requirement.
Delivery Detail:in 7 working days after order conformation

Related Product for Post Tensioning Prestressed Anchorage