Painted Q235 Concrete Slab Formwork Scaffolding System - AC-Formwork

1.Panited Concrete Slab Formwork, 2.Material:Q235, 3.Size:1220*2440*6-18mm,915*1830*6-18mm, 4.Usage:Construction Formwork - details see: https://www.buildingsupplieshub.com/painted-q235-concrete-slab-formwork-scaffolding-system-10073805
Place of Origin: Beijing China (Mainland)Brand Name: ACModel Number: AC-FormworkSize: 1220*2440*6-18mm,915*1830*6-18mm
Usage: Construction formwork,Wall panel, FurnitureSurface: Good appearance & nice touchLongevity: At least 8-12 years in the outdoor weather conditionColor: Optional(Yellow or Dark)
Distortion Resistance: Almost no Contraction / ExpansionMoisture Resistance: Dampproof, No HygroscopyUV resistance: High Grade UV resistanceFeature: Hot-Sale Slab Formwork
Package: As requested   
Painted Q235 Concrete Slab Formwork Scaffolding System
contact supplier for Painted Q235 Concrete Slab Formwork Scaffolding System


Good Quality Slab Formwork For Construction:

Solid panel makes the process of the wall formwork easy and it is used in making concrete walls.To make a high concrete wall, it is necessery to use a Bracket and its attachments.

Good Features:

1.Steel Concrete formwork succeeds in minimizing imperfections in the concrete finish and creates a neat joint and tie arrangement.

2.By screw and nut connection,steel concrete formwork system does not require any spacer tubes and work takes place from only one side.

3.Concrete formworkis welded with vertical and horizontal steel ribs to reinforce the panel under heavy loads.

4.Steel concrete formworkcan be used for horizontal slabs or vertical walls.

5.The flange of formwork are drilled holes every 150mm for indivisual formwork plates joint together with screws and nuts.

6.We can manufacture different sizes and plate thickness ofsteel formworksfor the purpose of different required projects.

Product Details:

ShapePlain,external corner,internal corner,circular
Plate thickness2.5mm,3mm,4mm,5mm
Flange height55mm
Applicationconcrete wall,slab,beam,column,foundation,stair
Working spanmore than 10 times
AssemblyBolted connection

Packaging Detail:Could be done as customers' requests
Delivery Detail:About 15-25 days on receipt of your payment

Related Product for Painted Q235 Concrete Slab Formwork Scaffolding System