OEM durable plastic construction formwork
		Specifications, Plastic formwork, Low cost & more productive, Simple, reusable with a long lifespan, Reliable & High quality - details see: https://www.buildingsupplieshub.com/oem-durable-plastic-construction-formwork-10089954
	
	| Type: Other Plastic Building Materials | Place of Origin: Zhejiang China (Mainland) | Brand Name: HD | Product: construction formwork | 
| fuction: construction | material: plastic | shaping Type: plastic injection | reusable: YES | 
| recyclable: YES | environment protection: YES | on time delivery: YES | 
Construction Plastic Formwork
Our plastic construction formwork is a new style environment-friendly interlocking and modular systems which offers great simplicity, efficiency, reusability and durability. It offers real alternative to the plywood. This product has different specifications.
Main Features& Advantages
- Long lifespan&Cost effective-- Plastic Formwork can be reused over 50 times, where Plywood can only be reused 3 to 5 times. Therefore the Plastic Formwork is more cost effective than the steel or bamboo formwork.
 - Waterproof-- The nature of plastic materia.Imputrescible and rustless, especially suitable for underground and watery circumstance
 - Interlocking Design-- No release agent needed, good effect of demolding.
 - Easy deassembly-- The template will be separated easily from concrete
 - Simple Installation-- Lightweight andsafe to handle, easy cleaning and very robust.
 - High Quality-- Abrasion resistance, excellent mechanical property, best impermeability.
 - Recycable-- Waste scrap molding board could be recycled.
 
Plastic Formwork vs Bamboo/Plywood Formwork
the below comparison data is based on for a building area of 1000 square meters:
| Type | Square Timber(mm) | Spacing Interval of Secondary Frame(mm) | Length(cm) | Cubic Meter of Time(square meter) | 
Bamboo(wood) Plywood Formwork  | 50*100 | 200 | 200 | 27.5 | 
| 50*100 | 250 | 200 | 22 | |
Plastic Injection Formwork  | 50*70 | 800 | 300 | / | 
| 50*70 | 1000 | 300 | / | 
Plastic Formwork Gallery
Please feel free to contact us for more information.
| Packaging Detail:Standard export packing or according to the customer's requirement | 
| Delivery Detail:25-45 days or according to the real situation | 

	