Malaysia Mivan Lightweight MFE Aluminum Formwork System - Mivan

1.Material: Aluminum, 2.Construction Speed: 1 floor in 4 days, 3.Panel Feature: Recyclable, 4.Certifications: ISO 9001:2000 - details see: https://www.buildingsupplieshub.com/malaysia-mivan-lightweight-mfe-aluminum-formwork-system-10073751
Place of Origin: Kelantan MalaysiaBrand Name: MFE FormworkModel Number: MivanMaterial: Aluminum
Construction Speed: Highrise 1 floor in 4 daysPanels Feature: 100% RecyclableCertifications: ISO 9001:2000Use For: High and low-rise concrete structures
Malaysia Mivan Lightweight MFE Aluminum Formwork System
contact supplier for Malaysia Mivan Lightweight MFE Aluminum Formwork System


MFE FORMWORK TECHNOLOGY SDN. BHD.was first formed in Malaysia in 1991 as part of the Mivan Ltd. group of companies and became known as MFE Formwork Technology Sdn. Bhd. in 2007. MFE Formwork is a lightweight hand held aluminium forming system that is bespoke designed for each and every project. Upon receiving structural and architectural drawings, we design our Formwork to suit your structural requirements be that an all wall or column, beam and slab construction method or even a mixture of both.

The basic element of MFE formwork is the panel which is a combination of extruded aluminium sections, manufactured from a high strength aluminium alloy to very high specifications and very strict tolerances. The contact face of the panel is a 4mm thick extruded section which is reinforced with specially designed extrusions that act both as a stiffener and for ease of handling. Once welded together, it forms a robust component that is lightweight with excellent stiffness to weight ratio, yielding minimal deflections under concrete loading.

Advantages of MFE Formwork Technology
1. forms the complete structure
2. custom designed to suit architecural and structural features
3 unsurpassed construction speed - highrise 1 floor in 4 days
4. high quality finish
5. cost effective
6. panels can be re used up to 300 times and are 100% recyclable
7. erected using unskilled labour
8. lightweight - no need for heavy lifting gear

Specifications

Place of OriginKelantan, Malaysia
Brand NameMFE Formwork
Model NumberMivan
MaterialAluminum
Construction SpeedHighrise 1 floor in 4 days
Panels Feature100% Recyclable
CertificationsISO 9001:2000
FOB PriceUS $ 200-260/ Square Meter
Minimum Order Quantity1 Square Meter/Square Meters
Packaging DetailsShrink wrapped on wooden pallets, packed into containers.
Delivery Time8 to 10 weeks
Payment TermsL/C,T/T
Supply Ability35,000 Square Meter/Square Meters per Month

Other Product Pictures

Packaging Detail:Shrink wrapped on wooden pallets, packed into containers.
Delivery Detail:8 to 10 weeks

Related Product for Malaysia Mivan Lightweight MFE Aluminum Formwork System