Foam liquid waterproof material - ZONZI-WC

1.ISO9001,ISO14001;, 2.one/two component polyurethane roof waterproof coating;, 3.Color:Red,grey,white,green and others - details see: https://www.buildingsupplieshub.com/foam-liquid-waterproof-material-10100736
Type: Other Waterproofing MaterialsPlace of Origin: Shandong China (Mainland)Brand Name: ZONZIModel Number: ZONZI-WC
Color: red,black,green,etcUse scope: building waterproofTensile strength: 1.9-2.45MPaElongation at break: 450%-550%
Application Method: Brush   
Foam liquid waterproof material
contact supplier for Foam liquid waterproof material


one/two component polyurethane roof waterproof coating

Main features:


1.It is safe and environment-friendly product without solvent or pollutants. And it has approved tests by state related testing bodies so it is applicable directly to dinking waterproof works.

2.As mono-component product, it is easier to handle. And coating application is simple.

3.Compose of pure polyurethane, the coating film is featured with rubber's properties. High-elasticity, high-strength, high-extensibility and high adhesion.

4.It is applicable to heavy-film coating, and the film has high compatibility without pinholes or bubbles.

5.The film is generated by chemical reaction, featured with water-resistance, corrosion resistance, fungus resistance.

6.It is featured with good physical and mechanical properties ,high resilience, anti-fatigue, aging resistance. Its tensile strength reaches as high as 3Mpa with elongation at break 600%.

7.Good weather ability makes it adaptable to drastic changes of weather regardless of hot or cold.

8.Water-curing Mechanism make the scope of its application wider.

Construction Points:

1.Base-treatment:it is required to be firm, leveled, clean, and dry.

2.partial treatment: internal and external corners should be shaped arch, the joints between pipes, walls and plates should be filled with this product. If necessary, non-woven fabric or fiberglass mesh fabric should be added to these joints. After this, coating-application of large-area can be carried out.

3.Application of coating: coat the base several times(2-3times suggested),the direction coating of different times should be perpendicular. Another time of coating should be not carried out until the previous coating is too dry to stick to hands.

4.Vertical-face Treatment of walls :after painting the last time of coating, sand should be scattered before it is solidified.

5. Construction of external layer: after the coating is solidified completely(about 48 hours), conduct the construction of external layer.

6. Suggested Quantity: Film Thickness:1MM, Coating Dosage:1.2-1.25kg/sqm.

Scope of Application:

1.Its applicable to waterproof and moisture works all kinds of building,eg roofing, basements, balconies ,kitchens, lavatories and so on.

2.It is very suitable for waterproof construction for place where the shape is complex and many pipeline bend places.

Product specification:

TypeSingle component Waterproof Coating
MaterialIsocyanate and Polyether
Thickness1.0mm-3.0mm
Density1.3-1.5Kg/sqm while thickenss is1mm.
Usagebasements, kitchen, lavatories, Balconies, roofing, underground tunnels, bridge projects etc.
Application MethodBrush
PackingBarrel, Pallet ;25kg/barrel
ColorsCustomized

Technical data:

No

Item

National StandardⅠ

National StandardⅡ

1

Solid Content %≥

80

2

Dry Time h≤

Dry time of Outside

12

Dry time of Inside

24

3

Fracture tensile strengthMpa≥

1.9

2.45

4

Breaking elongation,(normal temperature) %≥

550

450

5

Water impermeability, 0.3Mpa 30 min

Impermeable

6

bending at low temperature°C ≤

-40

7

Bonding strength of Moistbase Mpa≥

0.5

Remark:Product property can be customized .

Points for Attention:


1.it is supposed to be sealed and stored upside down in a cool and dry place, avoiding direct sun exposure, humidity,


2.During storage, there would be buildups on its surface. Just get rid of the buildups before application.


3.Unspent coating is supposed to be sealed timely in case of curing and abandoned


4.In and after the process of waterproof construction, protect it timely, guarding against artificial damage.

5.The storehouse or construction site should be kept away from fire. In the process of construction, workers are supposed to be wearing protective clothing.

6.Storage time is 6 months. If it is qualified enough beyond storage time, it can still be put into use.

Pls Note:

1).the storage place should be dry,aerating and avoid water.


2).it is forbidden to contact fire because the easy is easy to burn .


3).stir the paint homeogeneously before application if Group II materials is found to be of some precipitate.


4).the finished paint waterproof layer should be protected well to avoid damage befor the applcation of protection layer.In case the paint layer is found to be damaged ,cut down around the place torepair with paint.

Packaging Detail:in barrels with pallets(standard export packing)
Delivery Detail:within 15-20days after downpayment

Related Product for Foam liquid waterproof material