construction formwork tie rod - high strength tie rod
construction tie rod for formworks, Easy to use and other size is available - details see: https://www.buildingsupplieshub.com/construction-formwork-tie-rod-10073649
Place of Origin: Tianjin China (Mainland) | Brand Name: TP | Model Number: high strength tie rod | quality management certification: GB/T 19001--2000---ISO 9001:2000 Quality Management certifications |
construction tie rod: steel Q235 | formwork tie rod: steel 45# | tie rod fastener: 40Cr | formwork fastener tie rod: 42CrMo |
tie rod for fastener: diameter 12mm to 60mm | steel tie rod: high strength | steel fastener tie rod: high breaking load | |

Production Description of tie rod |
| - construction tie rod for formworks
- Tie rod with different types:
1,ordinary intensity tie rod. 2, high strength tie rod. 3,tie rod with waterproof plate etc. . - Tie rod with different surface treatment:
1,galvanized. 2,hot dip galvanized. 3,paint coated
| Name | Value | Brand | TOPONE | Production Capacity | 50000 Piece/Pieces per Month | Place of Origin | China | Certification | GB/T 19001-2000 ISO 901:2000 Standard | Dimension(L*W*H) | 15/17mm | Weight | 1.5kg/m |
|
|
Application |
- The tie rod is used inconcrete formwork fasten.
| |
|
Shipping |
- ship transportation
- INTERNATIONAL AIR MAIL: around 2-4 weeks to arrive
|
|
Payment |
- TT30% IN ADVANCE, balance 70% BY TT BEFORE SHIPPMENT.
- L/C
|
|
Packing |
The tie rod and accessaries are packed in woven bags . | |
|
About US |
We have about 20-year experiences on formwork fasten system. We are a typical China supplier and have taken part in the construction of all the Beijing Olympic Venues and all the nuclear power stations etc. |
|
|
| Our service\Buyer Guidelines Our main products include frmwork fasten assembly, tie rod, coil rod, steel cone, wing nut, plate nut, dome nut, waller plate, and other formwork accessaries. We also supply base jack, head jack, shoring prop, and tilt up brace. For any questions and comments, please feel free to contact us. Tianpeng, makes constructions time-efficient and cost-effective. |
Packaging Detail:According to customer's requirement |
Delivery Detail:Within 25-30 days after 30% advance payment. |
Related Product for construction formwork tie rod