Auto Repair And Body Shop Steel Buildings - YL62247
*Low price, *Modern& prefabricated design, *Fast construction, *ISO9001:2000certification, *Use: warehouse - details see: https://www.buildingsupplieshub.com/auto-repair-and-body-shop-steel-buildings-10040324
| Place of Origin: Shandong China (Mainland) | Brand Name: QDYL | Model Number: YL62247 | Frame material: Q345 wind column Q235 |
| Purlin: C sectional steel 2.5mm thickness | Bracing: Angle steel, welded pipe etc | Wall and roof: Glass fiber with steel sheet | Surface: Painted |
| Color: light grey, red, sea blue | Window: PVC window | Door: Rollin up door |
| Dimensions | 60*20*6m,15%slope |
| Design load | Wind speed:50Km/H, no snow no earthquake |
| Main Frame | Q345B Welded H Beam |
| Secondary Frame | Q235 C or Z section Purlin, Round Bar |
| Bracing | Angle brace, Welded Pipe |
| Wall system | single color steel sheet |
| Roof system | single color steel sheet |
| Steel sheet thickness | 0.476mm |
| Insulation | glass fiber |
| Insulation thickness | 50mm |
| Down pipe | need |
| Outgutter | need |
| Ventilation | need |
| Window | PVC window |
| Door | Folding up door |
| personal door | |
| Surface | painted |
| Utilities | Only steel warehouse |
OUR COMPANY
R&D Team
Engineering:
More than 15 people
Software: PKPMK CAD X-STEEEL etc.
We can design for you according to your requirement with high quality and fast efficiency.
Quality Control:The third party, SGS,ASIA inspection all accept
| Frame material | steel/metal |
| Pressure treated wood type | hot treated |
| Frame surface treat | Paint or hot dip galvanize |
| Material | Q235 Q345 |
| Design standard | GB50017-2003 |
| Construction quantity | GB50205-2001 |
| Echnical Specification | JGJ81-2002, J218-2002 |
| Purlin | C or Z section steel, 1.8-3.0mm |
| Bracing | Angle steel,welded pipe etc. |
| Wall& Roof cladding | Panel or steel sheet |
| Insulation | EPS,PU,Rock wool, glass fiber,50-150mm |
| Window | PVC, aluminum alloy, skylight PVC |
| Door | Sliding, rolling up door, PVC, aluminum alloy |
| Accessories | Outgutter, downpipe, ventilator, skylight etc. |
| Paint color | Sea blue, light grey, red etc. |
MANUFACTURING PROCESS
Installation team
With experienced installation team, we can assemble various of steel structure building with fast efficiency.
Design and Quotation need:
| Size | length* width*high, and the ridge height, slope |
| Standard | GB |
| Usage | What will building be used in |
| Country | Which country that the building will be |
| Design load | Wind speed, Snow load, Earthquake |
| Wall and Roof | Panel or Steel sheet |
| Insulation | Sandwich panel, Fiber glass, Rock wool,PU |
| Surface | Hot dip galvanize or Painted |
| Window | Quantity, material,dimension(WxH) and position |
| Door | Quantity, material,dimension(WxH) and position |
| Accessories | Down pipe, Out gutter, Ventilator, skylight etc. |
Welcome to our factories, we assure that our products will satisfy your needs with designs, competitive performance price ratio and best services.
| Packaging Detail:Normal packing or according to requirements,main frame packed in 40OT, wall and roof cladding packed in 40HQ or 40GP |
| Delivery Detail:Within 20-25 days |

