Aluminum Formwork/Monolithic Concrete Formwork

Aluminum Formwork, 1. Construction Speed:1 floor in 4 days, 2. High Quality Finish, 3. Cost Effective, 4. Lightweight - details see: https://www.buildingsupplieshub.com/aluminum-formwork-monolithic-concrete-formwork-10073900
Place of Origin: Jiangxi China (Mainland)Brand Name: GETOMaterial: Aluminum alloy 6061Feature: One-time pouring
Packing: Shrink wrapped on pallets, packed into containersUseage: High and low-rise concrete structuresPanels Feature: 100% RecyclablePatent: 39 kinds of patent
Techinque: Best technical supportCertificates: ISO9001, ISO14001, OHSAS18001  
Aluminum Formwork/Monolithic Concrete Formwork
contact supplier for Aluminum Formwork/Monolithic Concrete Formwork


Aluminum Formwork(GETO system) fully combined with building structure characteristics and worker construction habits and suits for home and abroad buildings.Starting from the wall panels,floor panels,columns,beams,doors,windows,stairs,support system etc. With 39 patents as the core, in the construction of the security,simplicity,efficiency,and construction of concrete surface effectetc all have improved significantly. So as to better highlight the aluminum formwork in the free plastering, verticality, flatness quality index, perception of construction quality indicator advantage. In addition, due to improving the construction speed, the number of installation workers has been reduced. With comprehensive comparison of old generation aluminum formwork system. It has the absolute competitive advantage.

Ten Advantages of Aluminum Formwork System

1. Light weight, high strength

The data has proved that the flexural strength of aluminum is triple higher than ordinary steel.With weight of 20-25KG/M2. Aluminum formwork is the lightest formwork for construction,which makes for easy handling.

2. Various sizes, high accuracy

The construction drawing is designed with strict structure, with little measurement error and high accuracy,which is very suitable for high rise buildings.

3. Safe and convenient construction

High loading capacity requires less use of props, reducing lost in material and labor. Workers can independently operate after simple training.

4. Long time used

With the lowest average lost, aluminum formworks can be used up to 300 times.

5. Wide range used

The precise-designed formwork system applies to all kinds of building elements, such as the main wall, column, beams, stairs and balconies.

6. Excellent quality

The concrete surface is very smooth, so it can saved the swing cost and shorten the construction period.

7. High efficiency

According to different climatic conditions, the formworks can be removed in 18-36 hours.

8. Recyclable value

The used aluminum material is of greater recyclable value,several times higher than steel.

9. Independent support system

The gap between the formwork support is totally enough for passing, moving and pulling.

10. Dependable safety, environmental

The construction process is totally safe. Full aluminum structure leads to no galvanization and thus minimizes the pollution to our earth.

Aluminum Formwork VS Timber Formwork

ItemUnitAluminum FormworkTimber Aluminum
cycle timesTimes150--3006--8
Template setsSet13--4
Unit price(including spare parts)RMB/Sq.M1380--1500100
Cost of labor for installation23--2525
Cost of auxiliary machinery/2
Residual value of formwork
300--400/
High-rise of a building (30 floors)34--3843
High-rise of a building (40 floors)26--2943
High-rise of a building (50 floors)21--2343
Same house type for two buildings (30 floors)17--1943
Same house type for three buildings (30 floors)11--1343

Remarks:

1. It will be different ,due to its different price of commodities and cost of labor in the locality .

2.Aluminum Formwork System contains all supporting, waling,release agent etc which must be used under construction.

Packaging Detail:Shrink wrapped on pallets, packed into containers
Delivery Detail:About 6 weeks after confirming drawings.

Related Product for Aluminum Formwork/Monolithic Concrete Formwork