0212 siphonic two piece toilet bowl - 0212
0212 siphonic two piece toilet bowl, 1.S-trap:300mm Roughing-in, 2.Size:610*410*685mm - details see: https://www.buildingsupplieshub.com/0212-siphonic-two-piece-toilet-bowl-10015078
| Place of Origin: Guangdong China (Mainland) | Brand Name: Zhioyein | Model Number: 0212 | Material: Ceramic |
| Structure: Two Piece | Installation Type: Floor Mounted | Feature: Dual-Flush | Drainage Pattern: S-Trap |
| Flushing Method: Siphon Flushing | Toilet Bowl Shape: Round | Color: White | Accessaries: Seat cover/Flushing fitting |
| toilet: siphonic two piece toilet bowl |
NAME: siphonic two piece toilet bowl
Production Description
| Product | 0212 ceramic toilet bowl siphonic two piece toilet |
| Item no. | 0212 |
| Size | 610*410*685mm |
| Feature | 1.S-trap:300mm Roughing-in 2.Chaoan factory 3.Easy clean,smooth & shining surface |
| Toilet seat | Soft closed toilet seat |
| Installation | Floor-Mounted |
| MOQ | 1*40ft (can mix different items) |
| Delivery time | siphonic two piece toilet bowl Within 30-45 days after receiving the 30%TT deposit |
| Payment terms | siphonic two piece toilet bowl T/T 30% deposit,70% balance before shipment. |
| Delivery port | Shantou/Shenzhen |
| Package | siphonic two piece toilet bowl Export packing or as per customers’ require |
Factory & Production Show
Chao'an Fengtang Town Shouya Sanitary Ware Basin Cabinet Factory
| Products | One piece toilet,Two piece toilet,Wall-hung toilet, Washbasin, Pedestal basin, Cabinet basin,Wall-hung basin,Urinal,Squatting pan and so on. |
| Tel | 0086-768-5330201 |
| Fax | 0086 -0768-6858740 |
| Contact Person | Chowchow |
| Mobile Phone | (+86)18927122141 |
| Web site | www.zhioyein.com |
| Business Type | Professional sanitary ware factory/manufacturer |
| Production Capacity | 20000 Set/ Sets per Month |
Please feel free to contact with us. We are warmly welcome you visit our facotry and check our product and qualtiy.
| Packaging Detail:Standard export packing or as per customers required |
| Delivery Detail:Within 30-45 days after receiving the 30%TT deposit |

