NEW circular column formwork plywood for construction - 1220x2440

1.plywood core: poplar/birch, 2.glue: waterproof melamine/WBP, 3.film: brown film, 4.steel belt: Q235steel, 5.screw: 8.8 grade - details see: https://www.buildingsupplieshub.com/new-circular-column-formwork-plywood-for-construction-10073921
Place of Origin: Shandong China (Mainland)Brand Name: senhaiModel Number: 1220x2440 
NEW circular column formwork plywood for construction
contact supplier for NEW circular column formwork plywood for construction


NEW circular column formwork plywood for construction

Specifications

Internal diameter(mm)Height(mm)Thickness(mm)
300-5503000 Max15
600-12003000Max18
1250-15503000Max22
16002400Max22
Usageconcrete forming of circular column in building

Description of goods

consist of two piece of semi-circle plywoods and steel belts
plywood have U.N slots at edge and can be joined seamlessly
steel belt fix the formwork every 200mm-300mm

Raw materials

plywood core: poplar/birch
glue: waterproof melamine/WBP
film: brown film
steel belt: Q235steel
screw: 8.8 grade

Features

Ø less cost (save 60% cost compared with traditional steel formwork)

Ø easy installation( light weight and installation by hands)

Ø cut easily

Ø good stability in size

Ø the surface of concrete after finishing is smooth

Ø reusable

Ø short building time (only 5 days)

Ø less labor cost

Ø low maintenance

Maintenance

It had better cleran the surface for formwork clearly aftering usage and don’t break the brown film. If for long time storage, pls put the formwork in dry environment, avoid extreme wet place, away from shinning and raining, and keep the bottom of formwork above ground about 20mm.

Application

Our circular column plywood formwork has been adopted by many building sites, such as Yantai Nuclear Power Station, Nanning Airport, Hanzhou Subway, Xuzhou Gym, Shanghai Fisherman Dock, Tai’an Culture and Art Center, and so on, which got good comment from our customers. Replacing traditional steel and aluminium formwork, it will play a leading role in the field of concrete forming in the future !

Setup and stripping

Engineering projects

Packaging Detail:in bundle or as per your requirement
Delivery Detail:Within 15-20days receiving deposit or original L/C at sight

Related Product for NEW circular column formwork plywood for construction