Galvanized metal walk board with hook for building scaffolding system - KH-SW-500-011

1.Galvanized metal walk board with hook for building scaffolding system, 2.Material:Q195-Q235, 3.Surface treat:hot-dipped galva - details see: https://www.buildingsupplieshub.com/galvanized-metal-walk-board-with-hook-for-building-scaffolding-system-10079170
Place of Origin: Guangdong China (Mainland)Brand Name: KingModel Number: KH-SW-500-011Metal walk board with hook: Galvanized metal walk board with hook for building scaffolding system
scaffolding plank: Galvanzed steel scaffolding plankscaffold plank: scaffold metal plankscaffold steel plank: scaffold steel plankscaffold catwalk: Building material scaffold catwalk
metal walk boards: scaffolding metal walk boardsconstruction plank: scaffolding construction plankbuilding material: building material hardware scaffolding deckingTel: Canna13651497173 skype:kingscaffolding
Color: Silver   
Galvanized metal walk board with hook for building scaffolding system
contact supplier for Galvanized metal walk board with hook for building scaffolding system


Product Description

Product detail:

1.Galvanized metal walk board with hook for building scaffolding system

2.Material:Q195-Q235

3.Surface treat:hot-dipped galvanised

4.Width:210,225,240,250,420,480,500mm

5.Thickness: 1.0-2.0mm

6.Length: To be produced as per your requirement

7.Folding box should be more stronger

8.Patent holes design to be reduced products' weight

9.Patent ribs make products stronger and drain the water providing any rain days

10.Life time:5 years guarantee

Dimension:

Scaffolding Cat Walking
ItemWide (mm)Height (mm)Thickness (mm)Length (mm)Weight (kg)
KH-SW-1829-001500501.21829.015.5
KH-SW-1829-002480451.21829.013.5
KH-SW-1829-003450451.21829.013.0
KH-SW-1829-004450381.21829.012.5
KH-SW-1829-005420451.21829.012.5
KH-SW-1219-001500501.21219.011.0
KH-SW-1219-002480451.21219.010.0
KH-SW-1219-003450451.21219.09.5
KH-SW-1219-004450381.21219.09.0
KH-SW-1219-005420451.21219.09.0
KH-SW-1829-006330501.21829.011.5
KH-SW-1219-006330501.21219.08.5

Features:

1. The Pierced Steel Plank(PSP)is strong, light, simple, fool proof, safe and inexpensive.

2. It is so simple that it can be laid on any fairly level piece of land with a few days work.

3. It is so foolproof that if some parts are lost, it will still be useful. It must be safe for

any type of construction, under any weather conditions.

4. It is be so light that it can be transported swiftly and easily to any spot

5. The PSP(Piereced Steel Plank) was designed with holes to reduce the weight,

improve traction and facilitate drainage. Flanging the holes kept the mat durable

by compensating for the strength lost by removing a portion of the metal

Wide variety of consumers:

1. Temporary and permanent aircraft landing fields or runways

2. Temporary roadways or access routes for trucks, heavy equipment, backhoes, concrete trucks, tree trimmers and cranes.

3. Construction Sites

4. Helicopter Landing Pads

5. Irrigation Tracks

6. Launches and boat ramp extensions

7. Corrals and chutes for livestock

8. Warehouse flooring 9. Mobile home moving

10. RV tracks or storage areas

11. Storage platforms for heavy equipment, supplies or runways.

How to extend scaffolding walking Board

1.Have a 'competent person' assess and document the needs of the area for extended

scaffolding. A 'competent person' in some states is required to have special licensing,

and in others experience with scaffolding set up is enough. What is important is that

you keep some form of documentation that the person designated as 'competent'

approves each step of the scaffolding assembly

2.Assemble the frame of your scaffolding system. Whether it is mobile or stationary,

make sure that the supports for your scaffolding plans follow the assembly plans

3.Lay your first plank across the supports of your platform. Have your competent

person check that each plan extends a minimum of 6 inches and a maximum of

12 inches past any support bracket.

4.Extend your scaffolding plank by laying the next plank over it. If the span

of your support is 7 feet, your plans must overlap a minimum of 6 inches up

to a maximum of 12 inches. If the span of your plank support is 10 feet, the boards

must overlap 12 inches.

5.You may provide cleats to additionally connect your extended scaffold planks again.

Ask your competent person to designate that the cleats are provided and used only

to prevent the scaffold planks from sliding and not as a means of providing any

re-enforcement to the boards at all.

Tips & Warnings

1.Always use components from the same manufacturer.

2.Standard top safety rails are only for safety, and not for rigging. If you need to add a rail for rigging, you can build your own by splicing pipe onto the risers, but use very strong connectors for assembly, such as three way crosses or ladder chain with bolts

Our Services

Packaging & Shipping

Company Information

Packaging Detail:Galvanized metal walk board with hook for building scaffolding system10pcs/bundle or as per customer's instruction
Delivery Detail:15 days

Related Product for Galvanized metal walk board with hook for building scaffolding system