Formwork Used For Building Construction

Formwork, *Material: Aluminum alloy 6061, *Construction Speed:4 days/floor, *Feature: 100% Recyclable, *High quality finish - details see: https://www.buildingsupplieshub.com/formwork-used-for-building-construction-10073675
Place of Origin: Jiangxi China (Mainland)Brand Name: GETOPacking: pallet or bulkPanels Feature: 100% Recyclable
Patent: 39 kinds of patentPouring: One-time pouringCost: EffectiveSkilled workers: No need
Technique: Best technical supportUseage: High and low-rise concrete structuresCertificates: ISO9001, ISO14001, OHSAS18001 
Formwork Used For Building Construction
contact supplier for Formwork Used For Building Construction


Jiangxi Geto Modern Construction Co.,Ltd- manufacturer of formwork, is a member of China Formwork Association. Phase I covers an area of 200,000m², including 30,000m²for the workshops, 30,000m²for the assembling fields and 10,000m² for the office building and business center. It is the largest manufacturing base and the first professional trading market in China.

Ten Advantages of formwork

1. Light weight, high strength

The data has proved that the flexural strength of aluminum is triple higher than ordinary steel.With weight of 20-25KG/M2. Aluminum formwork is the lightest formwork for construction,which makes for easy handling.

2. Various sizes, high accuracy

The construction drawing is designed with strict structure, with little measurement error and high accuracy,which is very suitable for high rise buildings.

3. Safe and convenient construction

High loading capacity requires less use of props, reducing lost in material and labor. Workers can independently operate after simple training.

4. Long time used

With the lowest average lost, aluminum formworks can be used up to 300 times.

5. Wide range used

The precise-designed formwork system applies to all kinds of building elements, such as the main wall, column, beams, stairs and balconies.

6. Excellent quality

The concrete surface is very smooth, so it can saved the swing cost and shorten the construction period.

7. High efficiency

According to different climatic conditions, the formworks can be removed in 18-36 hours.

8. Recyclable value

The used aluminum material is of greater recyclable value,several times higher than steel.

9. Independent support system

The gap between the formwork support is totally enough for passing, moving and pulling.

10. Dependable safety, environmental

The construction process is totally safe. Full aluminum structure leads to no galvanization and thus minimizes the pollution to our earth.

Aluminum FormworkVSTimber Formwork

ItemUnitAluminum FormworkTimber Formwork
cycle timesTimes150--3006--8
Template setsSet13--4
Unit price(including spare parts)RMB/Sq.M1380--1500100
Cost of labor for installation23--2525
Cost of auxiliary machinery/2
Residual value of formwork
300--400/
High-rise of a building (30 floors)34--3843
High-rise of a building (40 floors)26--2943
High-rise of a building (50 floors)21--2343
Same house type for two buildings (30 floors)17--1943
Same house type for three buildings (30 floors)11--1343

Remarks:

1. It will be different ,due to its different price of commodities and cost of labor in the locality .

2.Aluminum Formwork System contains all supporting, waling,release agent etc which must be used under construction.

Packaging Detail:pallet or bulk
Delivery Detail:about 50 days after confirming final drawings

Related Product for Formwork Used For Building Construction