Aluminum Alloy Formwork System manufacturer - aluminium formwork system

aluminium formwork system, 1.Total system forms the complete concrete structure, 2.Convenient, 3.Easy operation - details see: https://www.buildingsupplieshub.com/aluminum-alloy-formwork-system-manufacturer-10073862
Place of Origin: Hebei China (Mainland)Brand Name: JINBIAOModel Number: aluminium formwork systemName:: aluminium formwork system
Panels Feature:: 100% RecyclablePacking:: pallet or bulkUseage:: High and low-rise concrete structures 
Aluminum Alloy Formwork System manufacturer
contact supplier for Aluminum Alloy Formwork System manufacturer


aluminium formwork system

Aluminum Template advantage

1. Construction cycle is short, high efficiency :Aluminum formwork system for the fast form removal system, generally 18-36 hours to form removal, so only one layer of aluminum templates plus three single support can be used, a layer of the normal construction of up to 3-4 days, thus greatly shorten the construction period, the construction units to save administrative costs, as well as real estate developers to shorten the development cycle .

2. Reusable Low cost : Regulate the construction of a template can be flipped 300 times or more, use of low cost

3. Easy construction, high efficiency :Aluminum formwork system assembly is simple, convenient installation, simply pro rata increase the standard board, light weight aluminum template per square meter 18-25KG. Construction process is completely assembled by hand, transshipment; does not depend Lifting Equipment

4.Good stability, high capacity:capacity up to 60KN

5. Wide range of applications : Aluminum formwork system is suitable for all building components, such as load-bearing walls, columns, beams, stairs, balconies, etc., are available through the cement pouring at once .

Aluminum Formwork VS Timber Formwork

NO.ReferenceAluminum FormwrkTimber

Formwork

1Material cost (Included Support)$183-216/m2$13--16/m2
2Turnarond times200times at least3-5times
3assembling and dismantling labor cost$3.6-4.2/m2$4.2-4.7/m2
4recovery value$67/m2$0.8/m2
5subtotal arifical materials$4.4-4.9/m2$7.5-8/m2
6leveling the wall plastering labor cost$0.4/m2$2/m2
7leveling the wall plastering material cost$0.3/m2$2.6/m2
8ergonomics20m2/day15m2/day
9final ecomic indicators$5.9-6.4/m2$12-13/m2

Remarks:

1. It will be different ,due to its different price of commodities and cost of labor in the locality .

2.Aluminum Formwork System contains all supporting, waling,release agent etc which must be used under construction

The Material
The workshop
The constuction site
We want to hear from you !!!
Any further questions,please contact me !!!