Aluminum grouting injection packer - 13*85mm

Our high pressure adhesion injection packer are made of aluminum and equipped with a ball vale head. - details see: https://www.buildingsupplieshub.com/aluminum-grouting-injection-packer-10100061
Type: Other Waterproofing MaterialsPlace of Origin: Shanghai China (Mainland)Brand Name: RuthModel Number: 13*85mm
Material: Aluminuminjection pressure: above 10 MPaoperation Method: High pressure injection DeviceFunction: Entry port for injection resin
Drill diameter: 14mmPacker diameter: 13mmother name: injection needle 
Aluminum grouting injection packer
contact supplier for Aluminum grouting injection packer


Method of Construction for Injection

1. Before injection construction
Check the process procedure after finding the thickness, width and depth of crack and leakage condition of the structure.For wet surface, first clean water; for dry surface, clean dust.Carefully looking for crack points, use colored pens or chalk to mark along the cracks.

2. Drilling Operation
According to the thickness of concrete structures, from the crack of about 150 ~ 350mm, cross-drilled on both sides along the crack direction. 14mm diameter drill bit used. Holes and cracks in cross-section should be 45 degrees to 70 degrees cross, and the central cross in the bottom 1 / 2 range.

3. Packer Installation
Bury the packer with tools and fastening to ensure that the rubber part of the packer and the hole are dry before use, otherwise easily lead to slip when tightening.

4. Injection Operation
Injection should be started in elevation from bottom to top, when the foam material emerge from the cracks should immediately stop, and start again after a while. In the infusion process, if the material adjacent to the needle position has been filled, you can jump without injection. If found cracks extension in both ends or cracks with cross, should drill holes again and re-grouting.

5. Packer Removing Operation
Remove and break the packer by using vise pliers or hammer as a tool. If there is still a wet section, then inject the water stopping material again.

6. Finishing Operation
Remove the water stopping material that is remained on the crack section. Spread with the elastic sealing material.

Packaging Detail:paper carton
Delivery Detail:within 7 to 10 days upon down payment